ROYAL 111 SMOOTH-1.28The submittal engineers approve on first review.
A spec-response package for Millrace Plumbing Agency, a fictional plumbing and water agency, answering a commercial plumbing fixtures section. It has a branded cover sheet, a line-by-line compliance matrix and an indexed cut-sheet set, so the engineer never has to hunt for anything.
Section 22 42 00
Commercial Plumbing Fixtures
Prepared for engineer's review and approval
- Project
- Riverside Community Health Centre, Phase 2
- Engineer
- Halden Morrow Engineering
- Contractor
- Brightwater Mechanical Ltd.
- Submittal no.
- 22 42 00-01, Rev 0
- Date
- November 12
- Prepared by
- Millrace inside sales & applications
Rev 0
| Spec ref. | Requirement | Proposed product | |
|---|---|---|---|
| 2.1.A | Water closet flush valve, sensor operated, 1.28 gpf | Sloan ROYAL 111 SMOOTH-1.28 | ✓ |
| 2.2.A | Lavatory faucet, sensor, 0.5 gpm max | Moen Commercial M-POWER CA8304 | ✓ |
| 2.3.A | Filtered bottle-filling station, touchless | Elkay ezH2O LZS8WSLK | ✓ |
| 2.4.A | Floor drain, cast iron body, adjustable strainer | Zurn Z415-BZ1 | ✓ |
| 2.5.A | Reduced pressure zone backflow assembly, lead free | Watts LF909 | ✓ |
| 2.6.A | Finish: polished chrome | Per manufacturer standard | Note |
Note 2.6.A: confirm finish on lavatory faucet trim with engineer; alternate finish available.
- A1Sloan ROYAL 111 SMOOTH-1.283
- A2Moen Commercial CA83046
- A3Elkay LZS8WSLK8
- A4Zurn Z415-BZ111
- A5Watts LF90913
- B1Warranty & certifications summary16
- B2Installation & maintenance links17
- C1Contact & lead-time sheet18
Cut sheets are reproduced from each manufacturer's current published documents, with the model numbers for this project highlighted.
Select a page to open it in page view
Real models, published specs, linked sources.
ROYAL 111 SMOOTH-1.28
CA8304
LZS8WSLKezH2O filtered bottle filling station
- 8.0 GPH chilled
- 1.1 GPM fill
- Touchless sensor
Z415-BZ1
LF909Specs from each manufacturer's published product page; photos are representative (credits). Brand names belong to their owners.

Built to get a "no exceptions taken" stamp.
Engineers review dozens of submittals a week. A clean, indexed package that answers every spec paragraph gets through faster, and the agency that sends it gets remembered.
Section-by-section compliance matrix
Every paragraph of the spec section, the proposed product and a clear comply or note, so deviations are flagged by the agency, not discovered by the engineer.
Indexed, highlighted cut sheets
Manufacturer documents in spec order, with the exact model and options highlighted.
Branded cover and transmittal
Project, engineer, contractor and revision in one place, in the agency's own format.
Reusable templates per line
Each principal's common products are pre-built, so the next submittal takes hours instead of days.